  • #2807
    Aiden
    Participant

    The lower half of Ring Bark Frog (Frog/tower link to the Rock n Roll Fly over Bridge) has been cut. Now I believe there is a little bit left to cut at the top of Frog before it is completed. I took the cutter and bag from Frog/tower link and left them behind the ‘Easy Street’ sign at the Fly Over Bridge. The fuel canister was over 5/8 full so I didn’t fill it up (I can in future if that’s the going rule?). See attached picture.

    #2799
    Aiden
    Participant

    I’ll be using the cutter left at the frog/tower link intersection tomorrow morning.

    #2789
    Aiden
    Participant

    I’ll be looking at doing some cutting on Sunday morning around 0730. I’ll check in Saturday arvo to find out if I need to go to the container or if a cutter is still left on the mountain.