The lower half of Ring Bark Frog (Frog/tower link to the Rock n Roll Fly over Bridge) has been cut. Now I believe there is a little bit left to cut at the top of Frog before it is completed. I took the cutter and bag from Frog/tower link and left them behind the ‘Easy Street’ sign at the Fly Over Bridge. The fuel canister was over 5/8 full so I didn’t fill it up (I can in future if that’s the going rule?). See attached picture.